There are two important building projects that the church board has voted to recommend to the church members for review and vote. Our intent is to reach more members by providing this information electronically instead of having an in-person church business meeting.
How to vote:
- Please review the two proposals below.
- Respond to the text you received with two separate responses, either YES or NO. Here is an example:
- Roof: YES or NO
- Gym floor: YES or NO
School roof
Motion summary: After reviewing several bids, the church board recommends the bid from American Roofing, Inc to replace the school roof.
Cost: $74,500
Scope includes installation of a new, white, solar ready GAF Everguard 60mil TPO
thermoplastic roofing system on the existing 4750 sq. ft school roof. The installed system will carry an extended 31 year warranty. Review the complete bid for additional details.
Gym floor
Motion summary: After reviewing several bids, the church board recommends the bid from First Choice Concrete Surfaces to redo the 2536 sq. ft. gym floor.
Cost: $24,288
The following process will be followed:
Step 1: Grind and patch floor
Step 2: Install moisture vapor barrier
Step 3: Apply heavy duty epoxy at 10mm
Step 4: Apply heavy duty epoxy at 10mm again
Step 5: Sand and paint basketball and volleyball lines
Step 6: Apply HW urethane nonslip
Limited warranty included.